Who this checklist is for
-
Step 1: Size the system first, not the brand
-
Step 2: Evaluate the GoodWe 6kW inverter on specs, not marketing
-
Step 3: Read reviews like a skeptic
-
Step 4: Confirm Illinois-specific details
-
Step 5: If adding Level 2 charging, run the math first
-
Step 6: Shortlist installers, compare on value not price
-
Step 7: Lock down the details before signing
-
Common mistakes to avoid
Last spring, our facilities committee voted to explore solar. I'm not an engineer. I'm the office administrator who handles procurement — roughly $1.2M annually across 12 vendors. But because the project involved vendors, contracts, and a budget review, it landed on my desk.
Here's what I learned: the technical stuff (inverters, panel specs, charger math) is actually the easy part. The hard part is not getting talked into the wrong deal by a persuasive sales pitch or a suspiciously low quote.
So I put together the checklist I wish I'd had at the start. Seven steps. It covers GoodWe inverters (including the 6kW model we specified for our pilot site), what to actually do with reviews, the Illinois-specific details that surprised me, and the Level 2 charger math that everyone seems to get wrong.
Who this checklist is for
If you're a facilities admin, operations manager, or property owner coordinating a solar project in Illinois — and you're not a solar engineer — this is for you. You don't need to know the difference between a string inverter and a microinverter to run a good procurement process. You just need a checklist and a willingness to ask annoying questions.
Our pilot site is a 1,500-square-foot retail annex averaging about 750 kWh per month. That's a solid fit for a 6kW system. If it works, the main warehouse is next. So I've been through both the small-system and large-system questions.
Step 1: Size the system first, not the brand
The first mistake is starting with "which inverter should I buy." Wrong order.
Start with your 12-month electricity usage. Your utility bill has that number. If you're a business, ask your account manager for the kWh breakdown — it's usually free and takes a day.
For our annex, we average about 750 kWh per month. That points to roughly a 6kW system. The math: a 6kW array in Illinois produces somewhere between 7,000 and 7,800 kWh per year, depending on tilt, shading, and panel quality. That's enough for a small office or retail space.
(I should mention: I'm using "system size" loosely. The inverter rating and the array rating aren't the same thing. A 6kW inverter can pair with a somewhat larger array because of clipping — but don't quote me on the exact ratio. Your installer will spec that.)
What I wish I'd done: asked three installers to size the system independently before I even mentioned brand names. Two came back within 5% of each other. The third was 40% oversized — and I later learned he was padding the quote to hit a sales target.
Step 2: Evaluate the GoodWe 6kW inverter on specs, not marketing
Once you know the size, evaluate the equipment. We looked at GoodWe because two of our shortlisted installers carried it. Here's what I checked on the 6kW models (they have a few — the DT and EH series were the ones in our quotes):
- Efficiency: The spec sheets say 97.6–98% peak. That's competitive. Everyone's is competitive at peak. Look at the CEC-weighted efficiency if you want a real comparison.
- Warranty: GoodWe offers a 10-year standard warranty on many models, extendable. Ask what the extension costs. It's usually worth it.
- Monitoring: This is where GoodWe gets mixed reviews. The SEMS portal works, but some installers I talked to said it's less polished than SolarEdge or Enphase. For a business owner who checks the app once a month, fine. For an installer managing 200 systems, you might hear grumbling.
- Support: GoodWe's U.S. support has improved. Two years ago, wait times were the complaint. Now it's "fairly responsive." Not glowing, not terrible.
A note on "GoodWe inverter reviews": most of what you'll find online is either marketing or one-star complaints. The useful reviews come from installers who've deployed 50+ units. Ask your installer how many GoodWe systems they've installed and what their callback rate is. That's the data that matters.
Step 3: Read reviews like a skeptic
This is the step most people skip. They read five reviews, see four stars, and call it done. Don't do that.
Per FTC guidelines (ftc.gov), reviews and testimonials used in advertising must be substantiated. That's the legal part. The practical part: most solar review sites are lead-generation platforms. They'll publish anything that drives clicks.
Here's what I do now:
- I look for reviews that mention a specific installer by name. Those are harder to fake.
- I check the date. A five-star review from 2019 means nothing if the product shipped in 2022.
- I look for complaint patterns across multiple sites. If three different people say "monitoring app crashes," that's a signal. If one person says it, that could be a bad phone.
For GoodWe specifically, the recurring themes in installer forums were: solid hardware, decent value, occasionally frustrating app, generally improving support. That's a pretty typical profile for a mid-market manufacturer. (Should be clear: that's not a knock. It's just the honest read.)
Step 4: Confirm Illinois-specific details
This is where I almost messed up.
Illinois has real solar incentives — but they change. When we started, the Illinois Shines program was still taking applications. By the time we got to contract, the block was closed.
What to verify before you sign anything:
- Net metering: ComEd offers 1:1 net metering, but the rate structure matters. Ask your installer to model the actual bill offset, not just the "annual production" number.
- Illinois Shines / SRECs: The Adjustable Block Program pays for SRECs. Ask if your installer handles the paperwork or if you have to. We had to. It took three weeks.
- Interconnection timeline: This is the one that killed us. ComEd's review took longer than quoted, and our installer hadn't built that into the schedule. We lost a month of summer production.
"If the installer can't explain the interconnection timeline in one sentence, they don't know it." — A solar consultant we hired for one hour. Best $150 we spent.
Verify current program details at illinoisabp.com or with your utility. Don't take a salesperson's word for it — mine was wrong, and it cost us a rebate cycle.
Step 5: If adding Level 2 charging, run the math first
Part of our project included two Level 2 chargers for the fleet vehicles. The sales pitch was vague — "fast charging, overnight fill." I wanted numbers.
According to the U.S. Department of Energy (fueleconomy.gov), a typical Level 2 charger adds about 25 miles of range per hour. That's for a 7.2 kW unit (240V, 30A). Higher-power units (48A, ~11.5 kW) can push that to 35–40 miles per hour, but only if your vehicle and wiring support it.
For a full charge: a typical 60–80 kWh EV battery takes 8–10 hours at 7.2 kW. If your fleet is parked overnight, that's fine. If you need midday top-offs, you'll want the higher-power unit.
Two things I almost missed:
- Panel capacity: Each Level 2 charger draws 30–48 amps. Two of them plus the rest of your facility load might trip your main breaker. Ask your electrician to run a load calculation before you buy anything.
- Time-of-use rates: ComEd has TOU pricing. If you charge during peak hours, you're paying 2–3x what you'd pay overnight. Program the charger to avoid the peak. (Should mention: this only matters if you're on a TOU rate. Check your tariff.)
For the record, our 7.2 kW units take about 9 hours to fill the Ford E-Transit vans. That's fine for our schedule. If we were running a delivery route with midday returns, I'd want 11.5 kW.
Step 6: Shortlist installers, compare on value not price
This is where the value-over-price thing matters.
Here's the thing: the lowest quote is almost never the lowest cost.
We got five quotes. Maybe six, I'd have to check the spreadsheet. The range was $38,000 wide for what looked like the same scope. The cheapest quote was from a company we'd never heard of — it turned out they subcontracted half the installation to another outfit. That's not automatically bad, but it meant less control over quality.
In my experience managing $1.2M in annual procurement, the lowest quote has cost us more in about 60% of cases. The extra cost comes from rush fees, callbacks, missed deadlines, and the labor hours to fix what wasn't done right.
What to compare instead of price:
- Warranty terms (what's covered, for how long, who honors it)
- Monitoring setup (who configures it, who supports it)
- Interconnection paperwork (included or extra?)
- Change-order policy (how do they price changes?)
- References (call two, not one)
I still kick myself for not asking about the monitoring platform before we signed. Our installer used a third-party monitoring system that doesn't connect to the GoodWe portal. It works, but I have to log into two places. Small thing. But annoying for two years.
Step 7: Lock down the details before signing
The contract stage is where projects go to die. Two more items on my checklist:
- Confirm the interconnection scope. Who files the application? Who pays the fee? Who handles the utility back-and-forth? Get this in writing.
- Confirm the commissioning date is tied to a penalty. Ours wasn't, and we got pushed back six weeks.
I have mixed feelings about penalty clauses. On one hand, they feel adversarial. On the other, we had a vendor two years ago who treated "spring" as "June 30." A small penalty would have saved us a conversation with the CFO. (Should mention: our current installer did fine. The lesson is about the contract, not the company.)
Common mistakes to avoid
In no particular order:
- Starting with brand instead of load
- Trusting star ratings without checking the date or source
- Assuming incentives will still be there when you sign
- Sizing the Level 2 charger by the spec sheet instead of the car and the panel
- Picking the cheapest quote and paying for it twice
If you're doing a solar project in Illinois, do the boring work upfront. The technical parts are actually manageable. The vendor and contract parts are where projects get sideways.
And if you're considering GoodWe specifically: it's a reasonable mid-market choice. Reliable hardware, decent support, app that's "fine." Not the cheapest. Not the flashiest. Serviceable. In my opinion, that's exactly what a procurement checklist should be optimizing for.